Wolf Sub-Zero UC-24R Guia de Instalação Página 5

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 16
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 4
Site Preparation 5
subzero.com/specs
Before You Start
M
ake sure the opening dimensions, door clearance,
electrical service and plumbing are correct for the model
you are about to install. Refer to specifications on the
following pages.
IMPORTANT NOTE: To operate properly, the door must
open a minimum of 90°. Use a minimum 3" (76) filler in
corner installations to assure a 9 door opening. Allow
enough clearance in front of the unit for full door swing.
TOOLS AND MATERIALS REQUIRED
Appliance dolly able to support 130 lbs (59 kg)
Level 2' (.6 m) and 4' (1.2 m) recommended
Phillips and slotted screwdriver sets
Wrench set and allen wrench set
Crescent wrenches
Various sized pliers
5
/16" hex bolt nut driver
Drill and assorted drill bits
4' (1.2 m) of
1
/4" copper tubing and saddle valve
(4200880) for the water line (model UC-24CI)
Copper tubing cutter (model UC-24CI)
Masonite, plywood,
1
/8" pressed fiberboard, cardboard
or other suitable material to protect finished flooring
Vista de página 4
1 2 3 4 5 6 7 8 9 10 ... 15 16

Comentários a estes Manuais

Sem comentários