INSTALLATION GUIDEIntegrated Refrigeration

Página 2 - Contents

Site Preparation 10Anti-Tip Bracket InstallationINSTALL CONCRETE WEDGE ANCHORS:1) Drill a3/8" (10) diameter hole any depth exceeding theminimum e

Página 3 - Before You Start

Integrated Installation 11subzero.comIMPORTANT NOTE: For drawer units, the top drawer has acontrol cable that needs to be disconnected beforeremoving

Página 4 - (686) MODELS

Molding InstallationThe decorative white molding strips for the side and top ofthe unit can be snapped into place. The top molding stripused on integr

Página 5 - Overall Dimensions

Integrated Installation 13subzero.comWater Line ConnectionQUICK CONNECT WATER VALVEFor units with an ice maker, the quick connect water valveand PEX t

Página 6 - Opening Dimensions

Integrated Installation 14MOUNTINGBRACKETKickplate/grille installation.The kickplate/grille may be painted another color, ifdesired. Follow these easy

Página 7 - Electrical Requirements

Integrated Installation 15subzero.comPanel InstallationThe integrated design uses custom wood or other decora-tive panels and handles provided by the

Página 8 - Plumbing Requirements

Integrated Installation 16Door panel installation.Panel InstallationDOOR PANEL INSTALLATIONBefore attaching the door panel to the door, place twoscrew

Página 9 - Site Preparation 9

With the two mounting brackets in place, install thedrawer panel by engaging the top tabbed bracket first,then slide the lower ’L’ bracket onto the po

Página 10 - Unpacking and Moving

Integrated Installation 18Installation ChecklistTo ensure a safe and proper installation, the followingchecklist should be completed by the installer

Página 11 - Position the Unit

Service InformationIf service is necessary, maintain the quality built into yourSub-Zero unit by calling a Sub-Zero authorized servicecenter.To obtain

Página 12 - Level the Unit

Important NoteTo ensure the safe and efficient installation of Sub-Zeroequipment, please take note of the following types ofhighlighted information th

Página 13 - Water Line Connection

SUB-ZERO, INC. P. O. BOX 44130 MADISON, WI 53744 SUBZERO.COM 800.222.78207012802 REV-A 6/2009

Página 14 - MOUNTING

Sub-Zero Integrated RefrigerationThe importance of the installation of the Sub-Zerointegrated unit cannot be overemphasized. Installationshould be don

Página 15 - SIDE EDGE GAP WILL VARY

Model Specifications 4MODELS 700TR, 700TF(I) AND 700TC(I)TALL UNITSMODELS 700BR, 700BF(I) AND 700BC(I)DRAWER UNITS27" (686)14"(356)13/16&quo

Página 16 - PANEL BRACKET POSITIONING

Model Specifications 5subzero.comMODELS 736TR, 736TFI AND 736TCITALL UNITSInterior Capacity R cu ft (L) F cu ft (L)27" (686) TALL UNITS700TR 15.5

Página 17 - L BRACKET

Site Preparation 6Opening Width A700TR, 700TF(I) and 700TC(I) 27" (686)700BR, 700BF(I) and 700BC(I) 27" (686)736TR, 736TFI and 736TCI 36&quo

Página 18 - 90° Door Stop

Site Preparation 7subzero.comElectrical RequirementsThe electrical supply should be located within the shadedarea shown in the illustrations. Follow t

Página 19 - Service Information 19

Site Preparation 8Plumbing RequirementsFor integrated models with an automatic ice maker, thewater supply line should be located through the floor orb

Página 20 - 7012802 REV-A 6/2009

Site Preparation 9subzero.comAn anti-tip bracket and hardware is provided with the inte-grated unit. Placement of the anti-tip bracket is critical toa